OfficeMax
REGIONAL DISTRIBUTION CENTER
Hazleton, PA
To implement its aggressive distribution and supply chain management strategy, OfficeMax, Inc., a major retailer in office products, selected FDG to provide planning, site selection, designing, engineering and construction management services for a 585,000-SF greenfield distribution complex in Hazleton, PA.
- 52 acre site designed to meet the distribution mix of OTR, receiving and dedicated fleet transportation carrier requirements.
- Top of product design is 35’ with 45’ roof height .
- 50’ receiving dock and a 75’ shipping dock provides space for product staging and cross docking.
- 18,500 SF office space houses a data processing department, dispatch, breakrooms and restrooms.
- Facility wide early suppression fast response (ESFR) fire protection system in accordance with FM data sheet 2-2 and NFPA 13.
- Extensive material handling system utilizing piece-pick case flow and cross docking modules being inducted via a 4:1 combined merging system feeding the slat-shoe sortation system.
- Fast-track design and construction approach completed in October 1999 (Five month construction schedule).
REGIONAL DISTRIBUTION CENTER
McCalla, AL
To implement its aggressive distribution and supply chain management strategy, OfficeMax, Inc., a major retailer in office products, selected FDG to provide planning, site selection, design, engineering and construction management services for a 600,312-SF greenfield distribution complex in McCalla, AL. This is the second regional distribution center completed by FDG for OfficeMax within a five-month construction schedule.
- 58 acre site designed to meet the distribution mix of OTR, receiving and dedicated fleet transportation carrier requirements.
- Top of product design is 35’ with 45’ roof height.
- 50’ receiving dock and a 75’ shipping dock provides space for product staging and cross docking.
- 23,305-SF office space houses a data processing department, dispatch, breakrooms and restrooms.
- Facility wide early suppression fast response (ESFR) fire protection system in accordance with FM data sheet 2-2 and NFPA 13.
- Extensive material handling system utilizing piece-pick case flow and cross docking modules being inducted via a 4:1 combined merging system feeding the slat-shoe sortation system.
- Fast-track design and construction approach completed in June 2000.